The scope of this project included:

  • Replacement of the existing chillers with new high efficiency adjustable speed chillers in response to the need for CFC refrigerant phase-out.
  • Optimization and upgrade of existing hydronic economizer.
  • Conversion of the existing chilled water pumping to variable speed pumping/primary/secondary pumping.
  • Addition of variable frequency drive (VFD) to cooling tower fans.
  • Implement condenser water temperature reset.
  • Modify existing building air handler economizer cycles and deck temperature reset.
LSW provided SPC documentation and follow-up monitoring to support the $108,000 incentive from the local utility.

Previously, LSW Engineers provided all M/P/E and fire protection design for the $3,000,000 renovation and remodel to the first, second and third floors (114,000-SF) to allow for courtrooms, judges chambers, clerks offices, lounges, holding rooms, probation offices, and media facilities.

Owner: County of San Diego
Construction Cost: $1,150,000
Completion Date: 1997