![]() Juvenile Hall Complex San Diego, CA LSW conducted an initial feasibility study and schematic design for 1,400-ton chiller plant (CFC) and HVAC system. We surveyed the age and condition of the existing chillers, chilled water pumps, tower water pumps & cooling towers. We also interviewed operating staff and service contractor to determine adequacy of existing equipment, and reviewed utility bills and developed load profiles. In addition, we provided SPC documentation and follow-up monitoring to support the $116,000 incentive from the local utility. [ Back to Top ] [ Previous Page ] |